This project is a Waste Heat Self Owned Power Plant of Morowali Blast Furnace Smeltery, located at South Sulawesi, Republic of Indonesia. The total planning six units, the first phase of the project is built 2×35t/h sub-high temperature and sub-pressure gas boiler and 2×N7.5 condensing steam turbine generator units.