Indonesia Palembang project is located in TANJUNG ENIM, South Sulawesi, Indonesia, which is the first power plant invested and built by PT.BUKIT ASAM (PTBA). There are three boilers (56T/h CFB produced by Jiangxi Jianglian) and three turbo-generators (10MW pure condensing unit produced by China Chang Jiang Energy Corp. (Group)). PTBA is the largest state-owned coal mining enterprises in Indonesia. We are responsible for the operation technical guidance, equipment overhaul, etc.